Magnesia Road Hartlepool

Client: Hartlepool Borough Council

Project Value: £466,066 – Start Date: May 2015 Completed: Nov 2015

Brief Description of the Works

The works generally involve the construction of a new link road in cutting down an embankment. Connecting onto a new roundabout on Cleveland Road and all associated footways and street lighting.

The scopes of the works include:

  1. The construction of a new 7.3m wide carriageway between Old Cemetery Road and Cleveland Road. This is in cutting through an existing embankment.
  2. The construction of a new roundabout on Cleveland Road.
  3. The installation of new road drainage incorporating a storage tank.
  4. Revised layouts to existing footways
  5. Installing and maintaining acceptable diversion routes for both traffic and pedestrians.